EVERGENCES / INVESTMENT CASE

AI ROI Calculator

Artistic interpretation of an ancient calculating mechanism with bronze gears and a subtle evergences maker’s mark.

AI J-Curve

Illustrative incremental infrastructure, 2025–2035. Excludes pre-2025 assets. Assumptions, not actual global totals, client ROI or a forecast.

Read the Memo

Assumptions

Results

Get Consumers Paid

AI can lower costs, but the system still needs customers with money to spend. The goal is more purchasing power—not just more company savings.

Which tested scenarios earn back their investment?

Positive cumulative cash ROI at year 10

Annual operating unit-cost improvement; bar length shows share of tested combinations

Annual operating unit-cost improvement: 0%49.7%
Annual operating unit-cost improvement: 4%64.8%
Annual operating unit-cost improvement: 8%76.7%

At 8% annual unit-cost improvement, 77% have positive provider ROI. But only 28% of all tested combinations (605 of 2,187) satisfy both positive provider ROI and real household consumption at least the initial reference. We assume provider returns and household outcomes are different, and this is not a full welfare measure.

  • Improve delivery economics. Lower operating unit costs relative to selling-price erosion.
  • Build for paying demand. Affordable paid orders matter, not just desired usage or tokens.
  • Pace investment. Stage funded projects and allow construction and cohort maturity.
Definitions, captured values & assumptions

Fixed normalized captures, independent of the editable 2025–2035 dollar-trillion infrastructure model. These are shares of tested combinations—or total case weight in weighted views—with positive cumulative cash ROI at year 10, not real-world probabilities.

The infrastructure illustration covers incremental 2025–2035 commitments, excluding pre-2025 assets; it is not all planetary AI investment or revenue.

The grid tests income transmission. It does not test the post’s specific consumer-payment mechanism or guarantee positive returns.

This tested case changes from negative ROI with fixed unit costs to positive ROI at 4% annual improvement. This brackets a tested sign change; it is not a universal break-even threshold.

(Paid receipts allocated to new investment cohorts − cash operating costs − actual capital paid) ÷ actual capital paid. Before taxes, financing and distributions; opening-fleet historical capital is unknown and excluded.

No capital paid means undefined ROI, excluded from the denominator—not a success. All 2,187 cases in each displayed cost path have paid capital. Units are normalized new-investment provider cash—not USD trillions, GDP or whole-economy ROI.

Equal weight counts each combination once. Other views deliberately reweight the same cases; none estimates how likely the inputs are in the real world.

Exact captured shares; percentages rounded to one decimal. Equal weight.
Annual unit-cost improvementPositive provider ROIPositive cases / tested combinationsPositive ROI and household consumption ≥ reference
0%49.7%Exact share: 0.49748513946044811,088 / 2,18719.1%Exact share: 0.19112940100594422
4%64.8%Exact share: 0.64837677183356191,418 / 2,18724.1%Exact share: 0.24142661179698216
8%76.7%Exact share: 0.7668038408779151,677 / 2,18727.7%Exact share: 0.27663465935070874
Same 2,187 combinations per cost path: three levels in each of seven bundles. Relative level weights multiply.
BundleTested levels, in orderRelative weights
Labor adjustmentDisplacement leads · Partial adjustment · Rapid adjustment1 : 1 : 1
Purchasing-power transmissionConcentrated · Partial sharing · Broad sharing1 : 1 : 1
Compute cost and capital productivityCostly capacity · Reference costs · Efficient capacity1 : 1 : 1
Annual AI selling-price decline4% decline · 8% decline · 12% decline1 : 1 : 1
Finite funding availabilityEarly funding squeeze · Reference finite pool · Larger finite pool1 : 1 : 1
Accelerating desired use and budget ceiling10% to 20% growth · 20% to 40% growth · 30% to 60% growth1 : 1 : 1
Maximum annual new-project sizeRestrained delivery · Reference delivery · Faster delivery1 : 1 : 1
Exact input ranges & fixed rules
{
  "assumptions": [
    {
      "key": "labor",
      "label": "Labor adjustment",
      "levels": [
        {
          "name": "Displacement leads",
          "p": {
            "displacement": 0.08,
            "redeployment": 0.1,
            "newJobRecovery": 0.2,
            "hiringLag": 3,
            "newJobCreation": 0,
            "benefitStartYear": 4,
            "benefitReplacement": 0.2
          }
        },
        {
          "name": "Partial adjustment",
          "p": {
            "displacement": 0.04,
            "redeployment": 0.5,
            "newJobRecovery": 0.6,
            "hiringLag": 2,
            "newJobCreation": 0.01,
            "benefitStartYear": 2,
            "benefitReplacement": 0.6
          }
        },
        {
          "name": "Rapid adjustment",
          "p": {
            "displacement": 0.02,
            "redeployment": 1,
            "newJobRecovery": 1,
            "hiringLag": 1,
            "newJobCreation": 0.02,
            "benefitStartYear": 1,
            "benefitReplacement": 0.8
          }
        }
      ]
    },
    {
      "key": "sharing",
      "label": "Purchasing-power transmission",
      "levels": [
        {
          "name": "Concentrated",
          "p": {
            "wageGrowth": 0,
            "workerOwnership": 0,
            "ownerMPC": 0.3,
            "dividendPayout": 0.4,
            "priceDecline": 0,
            "goodsCapacityGrowth": 0.02
          }
        },
        {
          "name": "Partial sharing",
          "p": {
            "wageGrowth": 0.02,
            "workerOwnership": 0.5,
            "ownerMPC": 0.65,
            "dividendPayout": 0.7,
            "priceDecline": 0.02,
            "goodsCapacityGrowth": 0.05
          }
        },
        {
          "name": "Broad sharing",
          "p": {
            "wageGrowth": 0.04,
            "workerOwnership": 1,
            "ownerMPC": 0.8,
            "dividendPayout": 0.9,
            "priceDecline": 0.04,
            "goodsCapacityGrowth": 0.08
          }
        }
      ]
    },
    {
      "key": "efficiency",
      "label": "Compute cost and capital productivity",
      "levels": [
        {
          "name": "Costly capacity",
          "p": {
            "capacityPerCapital": 0.75,
            "aiVariableCost": 0.24,
            "aiPayrollPerCapacity": 0.16
          }
        },
        {
          "name": "Reference costs",
          "p": {
            "capacityPerCapital": 1,
            "aiVariableCost": 0.18,
            "aiPayrollPerCapacity": 0.12
          }
        },
        {
          "name": "Efficient capacity",
          "p": {
            "capacityPerCapital": 1.5,
            "aiVariableCost": 0.12,
            "aiPayrollPerCapacity": 0.08
          }
        }
      ]
    },
    {
      "key": "price",
      "label": "Annual AI selling-price decline",
      "levels": [
        {
          "name": "4% decline",
          "p": {
            "aiPriceDecline": 0.04
          }
        },
        {
          "name": "8% decline",
          "p": {
            "aiPriceDecline": 0.08
          }
        },
        {
          "name": "12% decline",
          "p": {
            "aiPriceDecline": 0.12
          }
        }
      ]
    },
    {
      "key": "funding",
      "label": "Finite funding availability",
      "levels": [
        {
          "name": "Early funding squeeze",
          "p": {
            "loanLimit": 4,
            "governmentBondLimit": 3,
            "initialInvestorCash": 60,
            "fundingStopYear": 4
          }
        },
        {
          "name": "Reference finite pool",
          "p": {
            "loanLimit": 8,
            "governmentBondLimit": 6,
            "initialInvestorCash": 120,
            "fundingStopYear": 99
          }
        },
        {
          "name": "Larger finite pool",
          "p": {
            "loanLimit": 12,
            "governmentBondLimit": 9,
            "initialInvestorCash": 180,
            "fundingStopYear": 99
          }
        }
      ]
    },
    {
      "key": "demand",
      "label": "Accelerating desired use and budget ceiling",
      "levels": [
        {
          "name": "10% to 20% growth",
          "p": {
            "aiDesiredGrowth": 0.1,
            "aiDesiredGrowthEnd": 0.2,
            "aiBudgetShare": 0.12,
            "aiBudgetShareEnd": 0.2
          }
        },
        {
          "name": "20% to 40% growth",
          "p": {
            "aiDesiredGrowth": 0.2,
            "aiDesiredGrowthEnd": 0.4,
            "aiBudgetShare": 0.18,
            "aiBudgetShareEnd": 0.3
          }
        },
        {
          "name": "30% to 60% growth",
          "p": {
            "aiDesiredGrowth": 0.3,
            "aiDesiredGrowthEnd": 0.6,
            "aiBudgetShare": 0.24,
            "aiBudgetShareEnd": 0.4
          }
        }
      ]
    },
    {
      "key": "build",
      "label": "Maximum annual new-project size",
      "levels": [
        {
          "name": "Restrained delivery",
          "p": {
            "projectSize": 4,
            "projectGrowth": 0.1
          }
        },
        {
          "name": "Reference delivery",
          "p": {
            "projectSize": 8,
            "projectGrowth": 0.2
          }
        },
        {
          "name": "Faster delivery",
          "p": {
            "projectSize": 12,
            "projectGrowth": 0.3
          }
        }
      ]
    }
  ],
  "fixed": {
    "life": 6,
    "twoCapitalPayments": true,
    "commissionOnlyAfterFullPayment": true,
    "initialConstructionCommitment": 8,
    "normalizedConsumerSalesReference": 100,
    "costImprovement": "Annual variable operating cost per paid unit AND payroll cost per unit of capacity; does not automatically increase physical capacity.",
    "sellingPriceDeclines": [
      0.04,
      0.08,
      0.12
    ],
    "capitalEfficiency": "Starting capacity per unit of capital varies separately at 0.75, 1, 1.5.",
    "investmentRule": "Modeled cash-budget-supported orders, positive current operating cash, finite funding and delivery constraints. Not optimal investment or observed contracts."
  }
}

In practice, track cost per completed, accepted result. Useful-work quality is not modeled by these normalized units. Lower payroll costs are not added again as household income.

Captured 2026-11-01 · scenario-grid-web-captures-2026-11-01-v1. These illustrative ranges are not calibrated probabilities.

Equal-weight fixed captures.

Methodology & full assumptions

The initial nine-month net compute-payback input calibrates the realized price; it is not independent evidence of returns or whole-project payback. Demand is driven by adoption, agents and active duty. Availability is 8,760 hours/year multiplied by duty, not continuous full utilization.

Commitment-year cohorts pay capital in equal stages during the two-year construction lag, ramp at 50% in the first operating year, operate for six years and retire. New investment responds to demand, a projected operating-payback hurdle and physical delivery limits. Costs, prices and capital efficiency follow the shown illustrative paths.

Capital is normalized at one full effective capacity unit per $1T of 2025 investment. Usage is allocated to active cohorts pro rata by productive capacity. Their receipts less operating costs and staged capital payments sum to the gold cumulative-net line. This is undiscounted cash accounting, excluding financing, tax, working capital and terminal value. Commitments unpaid after 2035 are separately disclosed.

The upturn is the first positive annual net after the last occurrence of the deepest cumulative deficit, using a $0.00000001T tolerance. It is distinct from cumulative recovery. No in-horizon recovery date is extrapolated. Cohort recovery uses annual observations, not fractional payback.

Methodology & limitations

Time is not automatically cash.

Monthly hours saved = volume × adoption × (baseline minutes − AI minutes, including review and rework) ÷ 60. Negative hours mean added workload. Only positive hours can be allocated.

Cash savings = positive hours × cash allocation × avoidable hourly cash cost. A loaded salary rate only shows a separate capacity-equivalent value; it never enters cash benefit.

Growth needs time and demand.

Extra units = the lesser of delivery capacity and your additional demand cap. Contribution per unit is after variable delivery costs, not revenue. Cash and growth allocations cannot exceed 100% of the same hours. Unused growth time returns to retained capacity.

Costs are project-level. Ramp is applied before each monthly demand cap. Payback is the first accumulated-cash crossing, assuming uniform accrual within each month. A simple steady-state comparison ignores ramp and is labeled separately.

This is an illustrative, undiscounted planning model, not a forecast or investment recommendation. It excludes tax, financing, staged implementation spend and any unentered costs. Negative saved time is shown as workload, with no assumed additional paid-labor charge. Enter that cash cost explicitly if applicable. Validate adoption, demand, avoidable spend and operating ownership before committing budget. Scenarios are alternatives, not additive benefits.

Projected cash benefit / total cost divides gross modeled cash benefit by implementation plus all operating costs over the selected horizon. It is not net ROI, MOIC or a guaranteed return. Capacity is excluded; zero cost makes the multiple undefined.

Runs in your browser. No email required. Your assumptions are not sent by this calculator, saved to storage or added to a URL. Existing site analytics remains in place; no calculator-value events are added.

Savings realization

Reconcile the plan with reviewed evidence.

Local entries. No upload or email.

Guide & safeguards

A faster workflow is useful. It becomes cash savings only when spending actually changes. Track the original business case against what happened—without counting the same benefit twice.

No upload or email required. This tool processes your entries in this browser. Don’t enter confidential information. Download your work before closing the page.

  1. Fix the baseline
  2. Record what changed
  3. Separate cash from capacity
  4. Review the evidence

“Realized” here means recorded by you with a dated evidence reference. It is not an independent audit. Forecasts, signed terms, cost avoidance and retained capacity remain separate.

Worksheet
Turn this business case into a working AI capability